Construction Business Unit
From conception through site preparation and civil works, prefabricated buildings construction and equipping, to occupation.
ES-KO’s proven solutions are designed to target:
For rapid deployment, ES-KO can design and supply mobile units for a quick mobilization and demobilization, to include mobile kitchens and surgical units; it is able to meet a wide range of engineering logistics and maintenance services. |
Camp Construction
ES-KO’s Construction Business Unit assesses the site conditions and logistics, designs the camps and infrastructures, procures, ships and erects the facilities and equipment.ES-KO can rapidly provide prefabricated buildings of any type, from traditional Panel Systems to containerized units (trans-pack or fully assembled) to construct virtually any type of camp facility: accommodation blocks, office complexes, kitchens, dining facilities, laundries, ablutions, recreation complexes, warehouses, workshops, medical centers, etc. ES-KO can also construct facilities by using traditional systems, via selected local subcontractors.A complete turnkey service can be provided to include entire camp construction management and maintenance following camp completion.
Individual products and services can be competitively provided to also include:
|
Health Care Engineering
ES-KO has been engaged in the health care field since 2007, providing design and health care facility construction services and delivering health care projects in remote and hostile environments all over the world.
ES-KO’s services include:
Thanks to its expertise in logistics and in medical and humanitarian aid, ES-KO’s Health Care Division has successfully and promptly delivered a full range of health care centers, including clinics, dispensaries, maternity wards and pediatric pavilions, in Madagascar, Mauritania and Niger. Subject to the client’s request or to the project’s location, the project may be performed with local materials, pre-fabricated containerized modules or wood structures. ES-KO coordinates the logistics and transportation of materials and equipment to site. ES-KO carries out civil engineering works, assembling pre-fabricated containerized modules and other services on site with the help of local companies using local workforce in compliance with rules, standards and local construction methods ensuring compliance with safety regulations. |
Products
ES-KO can competitively supply and install a wide range of products in difficult locations, thanks to its procurement capacities and its knowledge of the logistics.
ES-KO’s products advantages are:
ES-KO’s capacities include:
Special products:
|
Projects
Additional facilities and equipments supply for the Integrated Health Center of Makani Gao and Tabla, in Tilabery Region, NigerES-KO carried out the project’s study and completed the electricity works and connection to the public network, spatial grid inside the buildings, water supply (drilling, water tank, fire hydrant), and the renovation of existing buildings. ES-KO also provided the equipment for the delivery room, laboratory and consulting room and installed SSB radios for communications between the centers and the county hospital.
Additional amenities of the National Reference Center for Sickle Cell Disease in Niamey, NigerThe urbanization works included the completion of a patio, filling works in front of the building, external works (sanitation, creation of a green space, lighting) and installation of exhaust fans in several laboratories.
National Centre for fight against malaria in Antananarivo, MadagascarThis project includes an office block (250 m²), a laboratory (385 m²), training rooms (250 m²) and technical premises, occupying a total area of approximately 825 m² on a plot of 2,500 m². The laboratory consists of several rooms dedicated to the study, research and culture of insects.
Turnkey Integrated Type II Health Centre in Morarano, MadagascarThis integrated health centre project is comprised of a clinic (200 m²), of accommodation premises for the medical staff and of sanitary facilities, a laundry, a water tank, and an incinerator. The main building includes an outpatient treatment room, a labor, delivery and recovery room, a hospital room with two beds, post partum assistance services, and facilities for training and nutritional consultations. The health centre’s water tank and solar panels ensure its autonomy.
Construction of a field hospital Role 2, Herat, AfghanistanPhase 1 construction of a prefabricated Role 2 field hospital. Upon completion, the client requested the provision of additional works and ES-KO was subsequently awarded Phase 2 of the project, turnkey construction.
This project was constructed with containerized modules, equipped with all emergency health services required by international standards.
Design and turnkey construction of an 8,000-man camp, Aksai, KazakhstanThe project included the design, supply, transportation and supervision to erection of 54,000 m² of panel system prefabricated building structures, including accommodation, kitchen, laundry, first aid, recreation and office buildings to house 8,000 people.
The project was conducted in extremely difficult climatic conditions with temperatures ranging from -45C to +45C having severe implications in terms of materials specifications, transportation logistics and site activities. The overall contract was performed in sixteen months.
Design and construction of an 80-man prefabricated prison, KosovoConstruction of a prefabricated prison including the design, production, transportation, civil works, erection and installation. The critical point was to adapt a prefabricated building concept to the needs of security of a detention center. The overall contract was completed within eight months.
Turnkey construction of a 1,500-man police school academy, Kabul, AfghanistanTurnkey police school construction project including design, production, transportation, civil works, erection, installation of classrooms, offices, kitchen and laundry facilities and all related civil works systems and equipment.
Design and turnkey construction of airfield facilities, Herat, AfghanistanThe project included the design and turnkey construction of airfield facilities, cargo and passenger handling facilities and a bulk fuel installation. Project also included the construction of parking aprons and taxiways, revetment walls, lighting, flood lighting, grounding and anchoring for aircraft spots.
Turnkey construction of a 1,000-man camp in Bastion, AfghanistanThe project included the design and construction of ten 2-storey accommodation blocks, anti blast protection external structures, a power generation plant and all main external electrical, drainage, water, sewer lines and ground foundation works.









